跳至內容
選單
此問題已被標幟
2 回覆
109 瀏覽次數

The Date (02/28/2025) you've entered isn't aligned with the existing sequence number (MISC/2025/09/0002). Clear the sequence number to proceed. To maintain date-based sequences, select entries and use the resequence option from the actions menu, available in developer mode.

頭像
捨棄
最佳答案

The "09" in MISC/2025/09/0002 represents September.

Your entry is in February, so needs to have a sequence number like MISC/2025/02/xxxxx

Do what the error suggests and Odoo will reassign the correct sequence number, or manually edit it to have "02" instead of "09"

頭像
捨棄
最佳答案

Hi,


The error occurs because the journal entry date (02/28/2025) doesn’t match its sequence number (MISC/2025/09/0002), which belongs to September 2025. To fix this, you can either clear the sequence number so Odoo regenerates the correct one for February, use the Resequence option in developer mode to realign numbering with dates, or adjust the entry date if it was entered incorrectly. This ensures sequences stay consistent with accounting dates.


Hope it helps

頭像
捨棄