跳至內容
選單
此問題已被標幟
1 回覆
17143 瀏覽次數

Expert please explain how cron jobs works in OpenERP ?

As how it start on server start and stop when server stop !?

Also How internally it maintained ! Like to know its archetecture in short summry.

 

頭像
捨棄
作者 最佳答案

Cron jobs scheduling

Cron jobs are defined in the ir_cron table/model. This module deals with all
cron jobs, for all databases of a single OpenERP server instance.

It defines a single master thread that will spawn (a bounded number of)
threads to process individual cron jobs.

The thread runs forever, checking every 60 seconds for new
'database wake-ups'. It maintains a heapq of database wake-ups. At each
wake-up, it will call ir_cron._run_jobs_multithread() for the given database. _run_jobs_multithread
will check the jobs defined in the ir_cron table and spawn accordingly threads
to process them.

This module's behavior depends on the following configuration variable:
openerp.conf.max_cron_threads.

頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
1
1月 24
2693
0
4月 22
4280
0
1月 17
4547
0
12月 15
4858
3
9月 23
12059