Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda
2 Replies
368 Tampilan

"What are the correct steps to unbuild a manufactured product when using a 3-step manufacturing process (Pick → Produce → Store)? Should I create the unbuild directly from the manufacturing order, or is it necessary to first return the finished product transfer to bring it back to the production location, and also return the raw materials transfer from production to stock?"

Avatar
Buang
Jawaban Terbai
Overview

Unbuilding reverses the build process—disassembling finished products back into their components and updating inventory accordingly. This is useful for reclaiming parts from defective builds or breakers.

Step-by-Step Guide
  1. Navigate to “Unbuild Orders”
    Go to Manufacturing → Operations → Unbuild Orders, and click New to create your order.
  2. Fill in key fields
    • Product: Choose the finished product to unbuild. BoM auto-fills.
    • Bill of Materials: Confirm or change as needed.
    • Quantity: How many units to disassemble.
    • Manufacturing Order (optional): Select if unbuilding from a specific MO for traceability.
    • Source Location: Where the product currently resides.
    • Destination Location: Where reclaimed components will go.
    • Lot/Serial Number: Use if tracked.
  3. Confirm the Unbuild
    Click Unbuild at the top. Odoo deducts the finished product from stock and returns individual components to inventory. Any unusable parts should be scrapped afterwards.
  4. Review stock moves
    After unbuilding, use the Product Moves smart button to view details of the returned components.
  5. Scrap unusable parts (if needed)
    If some parts are damaged post-unbuild, use a scrap order on those components to keep stock accurate.

Avatar
Buang
Post Terkait Replies Tampilan Aktivitas
1
Mar 25
882
3
Jun 25
2598
2
Feb 25
1428
0
Nov 24
1213
1
Okt 24
1396