Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda

Hello, I need a bit of help in a small problem.

On my form I have a one2many editable field which must if required create another line with calculated values, like in v7.0 when introducing journal entries lines. The problem is that I am using V6.1 and I need a similar functionality. I thought maybe the context would solve the problem by setting the current line values at the context and reading them later, yet that doesn't work, for each line context open as empty. Anyone has a solution or ideia how to solve this issue?

Avatar
Buang
Post Terkait Replies Tampilan Aktivitas
2
Apr 20
4158
1
Nov 17
4371
0
Jul 17
7968
1
Mar 15
6791
0
Mar 15
3184