تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
5409 أدوات العرض

Hello, I need a bit of help in a small problem.

On my form I have a one2many editable field which must if required create another line with calculated values, like in v7.0 when introducing journal entries lines. The problem is that I am using V6.1 and I need a similar functionality. I thought maybe the context would solve the problem by setting the current line values at the context and reading them later, yet that doesn't work, for each line context open as empty. Anyone has a solution or ideia how to solve this issue?

الصورة الرمزية
إهمال
المنشورات ذات الصلة الردود أدوات العرض النشاط
2
أبريل 20
4106
1
نوفمبر 17
4318
0
يوليو 17
7941
1
مارس 15
6761
0
مارس 15
3140