Přejít na obsah
Menu
You need to be registered to interact with the community.
This question has been flagged
1 Odpovědět
5743 Zobrazení

I have 3 warehouses A, B, C.

I move the goods from warehouse A, B to the Transit Location of warehouse C. I configure for the Rule for the Transit Location of warehouse C to be Push to(When products arrive in C/TransitReceipts are created to send them in C/Stock.). When I check the receipts from Transit to C warehouse, it only takes a receipt for all the products from warehouse A and warehouse B without Source Document.

Who can help me to divide into 2 receipts after Transit push to Stock's Warehouse C: a receipt for goods from A (Soure Document ex: A / OUT / 0001) and a receipt for goods from B (Soure Document ex: B / OUT / 0002).

Thank you very much!

Avatar
Zrušit

Have you found a answer to that issue?

Nejlepší odpověď

You should select / create an Operating Type of type "Internal" and use it for your internal transfer from one warehouse to another.

Hope you got it

Avatar
Zrušit
Related Posts Odpovědi Zobrazení Aktivita
1
bře 25
4789
2
srp 25
512
2
čvc 24
1990
4
kvě 24
12832
1
dub 24
3446