Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie
1 Odpowiedz
5751 Widoki

I have 3 warehouses A, B, C.

I move the goods from warehouse A, B to the Transit Location of warehouse C. I configure for the Rule for the Transit Location of warehouse C to be Push to(When products arrive in C/TransitReceipts are created to send them in C/Stock.). When I check the receipts from Transit to C warehouse, it only takes a receipt for all the products from warehouse A and warehouse B without Source Document.

Who can help me to divide into 2 receipts after Transit push to Stock's Warehouse C: a receipt for goods from A (Soure Document ex: A / OUT / 0001) and a receipt for goods from B (Soure Document ex: B / OUT / 0002).

Thank you very much!

Awatar
Odrzuć

Have you found a answer to that issue?

Najlepsza odpowiedź

You should select / create an Operating Type of type "Internal" and use it for your internal transfer from one warehouse to another.

Hope you got it

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
1
mar 25
4799
2
sie 25
528
2
lip 24
1996
4
maj 24
12854
1
kwi 24
3455