Version control
Engineering change orders
Improve products and bills of materials (BoMs) with isolated engineering change orders (ECOs). Doing so prevents errors in and disruption of ongoing production because of new tests and changes.
Změny v kusovnících
Změňte komponenty, operace, pokyny pro výběr komponent, detaily pracovního střediska, dobu trvání operace a také konstrukční a CAD soubory.
Porovnávejte
View and compare all changes between production and revised BoMs in a dedicated ECO tab.
Latest BoM version
The latest approved BoM is *always* displayed to operators working on new manufacturing processes, so there's never confusion about BoM versions.
Aktualizace kusovníků
Update existing draft manufacturing orders to use the newly approved BoM with a single click. Existing and ongoing manufacturing orders continue with using the old BoMs, to avoid disruptions.
Revert
Make fully traceable and reversible changes to the BoM.
Aplikujte rebase
Manage merge conflicts in concurrent ECOs targeting the same BoM. If the production BoM is updated after creating an ECO, synchronize the ECO with the new production BoM with a single click.
Feedback
Automatically generate new ECOs based on feedback via submissions to an email alias, or directly from Odoo's Manufacturing or Shop Floor apps.
Výkaz práce
Operators can suggest changes to worksheet instructions *during* production. Images, PDFs, and Google docs can be added to help describe the change.
Dokumenty
Upload, archive, and manage design files in each ECO. After applying the changes, the new files are automatically linked to the production BoM. Archived files are removed from the BoM, but are still accessible in the ECO.
Project management
ECO type
Track and organize changes in a project for the ECO type. Add relevant collaborators from other teams to ensure they *only* view and assist with relevant BoM improvements.
Milníky
Set unique project stages (milestones) for each ECO type to track progress before applying BoM changes. Customizable stages to reflect each team's unique process.
Schvalování
Require approvals from an approver to prevent mistakes and premature actions. Approval requests are generated automatically when the ECO is moved to the next stage.
Chat
Invite relevant collaborators from different teams to each ECO. Log all ideas, approvals, and activities in one accessible place to keep everyone updated on changes.
Schedule activities
Easily create scheduled activities (e.g., tasks, development specs, meetings) with assigned deadlines for team members to efficiently manage product changes.
Reportování
Dohledatelnost
View all the ECOs for a product from one place, to track all the component, operation, design file changes.
Effective date
View the exact date and time a BoM version was used to manufacture a product.
Integrace
Sklady
Map out the procurement details (vendor information, vendor pricelist, delivery lead time, other procurement details) of newly components used in the revised BoM.
Discover ⟶