İçereği Atla
Menü
Bu soru işaretlendi
3 Cevaplar
5379 Görünümler

I am trying to create a Stockable Product, Procurement Methd: Make to Order, Supply Method: Manufacture. I have created orderpoint Minimum=30 Maximum=0

Bill of Materials for this products contains another two products which has 0 Minumum and 0 Maximum Orderpoint.

When I Confirm Sales Order and Run Scheduler, I have Two Request for quote for the all items in Bill Of Materials.

I thought we should have only one request for quote for each item in Bill Of material. Can some one help me to understand?

Appreciate.

Thanks

Avatar
Vazgeç
En İyi Yanıt

make_to_order /never/ looks at available stock. You have the first RFQ because the procurement for this product was set to make_to_order, so it literally created an order. You have the second RFQ because the scheduler noticed the orderpoint and created a RFQ for it.

To do what you probably want to do, set your product to make_to_stock. This will hit 'exception' because there is no inventory, and then the scheduler will check the orderpoint, notice < 30 stock, and create one RFQ for 40 (30 keep in stock + 10 you needed)

Avatar
Vazgeç
Üretici

Thanks CB. I will verify the flow as per your suggestion and post my feedback. Thank you once again.

İlgili Gönderiler Cevaplar Görünümler Aktivite
0
Mar 15
3170
2
Oca 17
4960
0
Mar 15
4458
0
Mar 15
3512
2
Mar 15
4150