İçereği Atla
Menü
Bu soru işaretlendi

In a manufacturing order when we have components with tracking on lot number it is automatic created quality checks with the check type 'Register consumption'.  As steps in the work order

You can add a component (Which is not in the BOM) in the manufacturing order.  Then the quality checks and the step for register that component is not created - even the added component also are traced with lot number.  So the operator are missing the steps to register the added component.

Any advice on how to fix this?


Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
6
Oca 23
6259
0
Eyl 21
3641
1
Haz 23
5396
0
Haz 22
2237
1
May 22
3171