Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda

I'm on Odoo V8 community and I've got an issue I can't for the life of me work out. When I submit my sales order (for multi level BOM) it schedules all of my manufacturing orders at the same time for the products to be made within the overall product the customer has ordered. On top of that the overall products being ordered are scheduled for a Saturday?

This is despite me creating a work centre and giving it a standard week timing, which are then linked in the as a work centre operation in the routings. I have attached the routings to all of the BOMs with timings and I have set the efficiency of the work centre to 1 as it will be 1 person carrying out all the tasks.

I have tried going into the work orders to schedule it myself but that is tedious and doesn't affect the manufacturing order scheduling. Any help would be greatly appreciated.

Avatar
Buang
Jawaban Terbai

So you wan to exclude BOM schedule for Sat and Sun? You can get a module for that somewhere in here:
https://apps.odoo.com/apps/modules/browse?search=bom&series=8.0

Other modules that may be useful:

https://apps.odoo.com/apps/modules/11.0/plm_automate_normal_bom/
https://apps.odoo.com/apps/modules/11.0/plm_date_bom/
https://apps.odoo.com/apps/modules/12.0/mrp_mpp_product_lead_time/
https://apps.odoo.com/apps/modules/8.0/mrp_plan_wizard/

Please see the possibilities of Odoo 10.0 or 11.0 as they are more advanced. Maybe it is a good time to migrate?

Avatar
Buang
Post Terkait Replies Tampilan Aktivitas
1
Agu 23
2087
0
Apr 23
1948
1
Sep 24
3989
1
Nov 21
2316
0
Apr 20
2282