Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda
1410 Tampilan

Dear All,

Is it possible to generate material and batch wise (Lot number wise) ageing report based on GRN date?

Can it be solved by changing configuration of the software or is it required to customize the software to achieve this?


Thanks.

BR,

Shomen

Avatar
Buang