تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
3266 أدوات العرض

So, after making a sale I can go to warehouse->schedulers and run a schedule in order to create a draft quotation, excellent.

But I have been told this can happen automatically if I go into Settings ->Technical ->Scheduler ->scheduled actions

But I cannot wrap my head around the way it works, do you guys mind helping with that?

Also I had a bit of a problem with a draft, I made a test sale which had about half a dozen products. When I ran the scheduler, it created a draft for every single product instead of creating a draft with every product that was to be sold, is there a way to make it work with a single draft?

الصورة الرمزية
إهمال
المنشورات ذات الصلة الردود أدوات العرض النشاط
1
مايو 25
990
2
نوفمبر 24
2200
4
فبراير 24
12358
sale / delivery تم الحل
1
يناير 24
1678
1
مارس 24
2207