İçereği Atla
Menü
Bu soru işaretlendi
1461 Görünümler

In odoo V17, I've established a quality control checkpoint at product reception. Any products that fail this check should be sent to the designated Fail location, just like it shows in this image:


However, when I confirm the reception of these products, they are still being sent to the original reception location 


The image shows that all the products where sent to the same location


Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Tem 23
2096
1
Eki 25
132
0
Ara 23
1460
2
Şub 25
54
0
Eyl 23
1732