İçereği Atla
Menü
Bu soru işaretlendi
1 Cevapla
5694 Görünümler

Dear OpenERP users,

I have a question about the planning of the capacity of a production location. I wonder if someone has a solution for this or maybe a work around?

I have 2 production location where they produce the same product. At these production locations they can produce a curtain amount per day or per week. The product are configured as make to order. So after a sales order there will be a manufacturing order. This manufacturing order has to planned in at one of the production locations that has enough resource available to produce it.

So basically you want to plan in the manufacturing order at multiple locations based on the capacity of the production location.

Is this possible in OpenERP? or is there a module available than can do this?

Best regards

Avatar
Vazgeç
En İyi Yanıt

Hello,

Right now you can only manually check your one production location. suppose your capacity is 1000. after this amount, you can apply push flow on product from production location ( stock) to any other location.

thanks

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Tem 25
502
0
Nis 17
2605
1
Mar 15
4637
0
Mar 15
3845
3
Mar 15
8522