I want to setup odoo for a manufacturing business, however I am facing some issues.

  • How do Control the qty produced in work orders and shop floor is not more than the number of its component or not more than the qty received from the previous work order. (apparently i can create 500 pieces for a MO of only 50 pieces)


  • How do I control the flow of the Work Centers/Operations that unless the previous WO is complete the next won't start
Avatar
Vazgeç
En İyi Yanıt

Hi,

Please refer to the following links:

1. https://www.cybrosys.com/blog/quality-control-with-odoo-manufacturing


Hope it helps.