İçereği Atla
Menü
Bu soru işaretlendi
3 Cevaplar
386 Görünümler

i have 3  Warehouses 

1-Raw material

2-Production

3-Finished Goods

i want when i make  Manufacturing Order 

odoo make trnsfer from raw material Warehouse  to production Warehouse 

and show to person who responipale on it the operation and validate it 

 and after that when production finished  odoo make trnsfer from production Warehouse to finished goods Warehouse and show to person who responsible on it to validate 

how can i do it?

Avatar
Vazgeç
En İyi Yanıt

You can achieve this workflow in Odoo by setting up automated transfer operations through the Manufacturing module. Create an automated action to trigger transfers from the Raw Material Warehouse to the Production Warehouse upon creating a Manufacturing Order, and a second action to transfer from Production to Finished Goods once production is complete, allowing responsible personnel to validate each step.

Avatar
Vazgeç
En İyi Yanıt

In your production WH, select Manufacture in 3 steps manufacturing ( Pick components, manufacture and then store products (3 steps).

Inventory > Configuration > Warehouses

After enabling, navigate to the routes Inventory > Configuration > Routes

On the 3 step manufacturing route, modify the rules

1 Pull from Source location - Raw material WH/Stock destination Production WH/ Pre-production

2 Push to source location Production WH/ Post-production destination location Finished Goods WH/Stock

Avatar
Vazgeç
En İyi Yanıt
  1. you have the three warehouses: Raw Material, Production, and Finished Goods, already configured.
  2. Manufacturing flow > 

Add Pull Rules for:

  • Raw Material to Production Warehouse: Configure it to move raw materials to the production warehouse when a Manufacturing Order (MO) is confirmed.
  • Production to Finished Goods Warehouse: Configure it to move finished goods to the Finished Goods warehouse when the production is done.

3 Set up the Push Rules to notify the person responsible for each transfer 

4 After that > the Raw Material Warehouse to the Production Warehouse. The responsible person will be notified to validate this operation. > the Production Warehouse to the Finished Goods Warehouse. The person responsible will validate it.

    

Avatar
Vazgeç