İçereği Atla
Menü
Bu soru işaretlendi
1 Cevapla
4078 Görünümler

I am evaluating the possibility to utilize OpenERP as project management tool for the team. I have installed the project management module and then project_gtd(called Todo Lists in the repository). But when I got into project, I can't see how to get access to GTD configuration to define our own context and timebox. I tried to follow the manual, but failed due to the problem above. Is there something wrong or steps missing?

Avatar
Vazgeç
En İyi Yanıt

hi;

After installing project_gtd, you can access the configuration under : Project ---> Configuration ---> GTD

Unless you don't have "Administration Settings" Access Rights.

Avatar
Vazgeç
Üretici

I was using admin account on testing environment so supposed already had the rights? I checked again in settings --> users, I set the admin account with "Project" - "Manager" and "Administration" - "Settings". But still no luck, the GTD under project didn't show up. The only item under project config is "Resources“. I also tried setting up the "Administration" for a normal user, not working. I was thinking is there any dependent application I have to install.

Have you checked "Technical Features" under "Accessibility" ?

Üretici

Well, here it is. After enabling Technical Features, the GTD config item is there. Thanks for your help. :)

You just have to vote ! Good Luck

İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Tem 25
480
2
Haz 25
2380
1
Haz 25
853
3
May 25
2373
2
Tem 25
1375