İçereği Atla
Menü
Bu soru işaretlendi
1 Cevapla
4002 Görünümler

I am trying to change the timesheet range to bi-monthly. I need the first timesheet of the month to cover the 1st to the 15th, and the second timesheet of the month to cover the 16th to whatever the last day of the particular month may be.

I know this can be done manually for each timesheet, I was just hoping to lessen error by employees if possible.

Thanks for your suggestions

Avatar
Vazgeç
En İyi Yanıt

I have the same problem if someone could help please.

Thank you.

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
0
May 25
957
1
Nis 25
1120
1
Şub 24
2835
0
Eki 24
4113
0
Kas 22
2291