İçereği Atla
Menü
Bu soru işaretlendi
1 Cevapla
1673 Görünümler

Hello, 

I like to make a 2 step transfer for a specific locations. for different products.

For Example:-

I like to transfer 2 different products to one main location which is Storage AB from there the system should be creates the 2 separate internal transfer for the products for the sub locations which is Storage AB/RM A and Storage AB/RM B. how to write a rule for that. is that i have to write a put away rule? 

kindly guide me with step by stem process

Avatar
Vazgeç
En İyi Yanıt

Putaways Rules you can use and define the destination location.

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
1
May 25
780
3
Eki 24
3956
0
Ağu 24
1620
1
Ara 21
2577
0
Oca 21
2929