İçereği Atla
Menü
Bu soru işaretlendi

I would like to factor in many variable costs into manufacturing for example: rent, electricity, labour cost, etc.


For example:

Want to manufacture a plate

Labour cost: $4 per hour

Electricity: $2 per hour

Rent: $3 per hour


however this process took faster than expected and it only took 30 mins to produce the plate and therefore the hourly cost of the labour, electricity, and rent should be halved in the cost analysis.


Thanks

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
0
Haz 25
1298
1
Mar 25
1528
0
Oca 25
1301
MRP and FEFO Çözüldü
1
Mar 24
2691
2
Ağu 23
1893