Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie

Hi,

I have the following products, which I can buy:

- String (UOM: km)
- Reel
- Reel of 400m string
- Reel of 200m string

I have a subcontractor who takes 1km of string and 3 reels. They turn that into 2 reels of 400m string and 1 reel of 200m string. All three are tracked by serial number, however, the raw goods are not.

What's the best way to set this BOM up?

Cheers

Awatar
Odrzuć
Autor

Is this such an unusual thing that nobody has an answer?

Autor Najlepsza odpowiedź

Thank you for your suggestions. I will look into this

Awatar
Odrzuć
Najlepsza odpowiedź

Hi,
Please go through our blog on how to set BOM in Odoo 16

https://www.cybrosys.com/blog/how-to-configure-bill-of-materials-in-odoo-16-erp


Hope it helps

Awatar
Odrzuć
Najlepsza odpowiedź

Yeah, i am not really sure why but they explicitly disallow by-products on subcontracting ...


https://github.com/odoo/odoo/pull/75041


A quick test on 15.0 shows you can disable the constraint and it works.



​
class MrpBom(models.Model):    
_inherit = 'mrp.bom'        

​@api.constrains('operation_ids', 'byproduct_ids', 'type')
​def _check_subcontracting_no_operation(self):   
​return True



But for your case you can of course just create 2 boms, one for a 200m reel  consuming 1 reel and 0.2km of string and like wise for the 400m reel.


and order those together (perhaps even using a kit)

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
1
cze 23
2002
3
cze 25
3005
2
lut 25
1565
0
lis 24
1333
1
paź 24
1547