When setting ‘2-step manufacture’, the components are already reserved for the manufacturing order after the pick/transfer reservation to the ‘pre-production location’, even if the reservation method of the related ‘manufacturing operation type’ is set to ‘manually’.
How can this be resolved so that if the reservation is set to ‘manually’, the components really can be manually reserved and/or assigned (by tracked components) properly to the MOs?
Thanks
BR
Ricardo