تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
2 الردود
2780 أدوات العرض

There have been several questions with answers ranging from variants to by products. No solution works for my application.

The scenario is thus:

I have one unit of raw material, say 1000m2 of paper. I run 1000m2 through a CNC cutter that creates three different paper shapes. I know 1000m2 nets me 300pcs of "X", 300pcs of "Y" and 300pcs of "Z." This ratio will not change.

The time is 900 seconds.

When I create a job: I want to run a single MO that creates 300pcs of the three SKUs (900pcs total) where each pc has 1 second of labor cost (900 seconds) associated.

I can start 3 MOs at one time, but the clock stops when I open up the next MO and start that clock. How can I get 3 MOs to run concurrently?

If I can't run 3 MOs concurrently, how do I add qtys to onhand stock w/ labor cost at one time?

الصورة الرمزية
إهمال

Can you explain why byproducts don't work? An MO that consumes the paper, makes X and has Y and Z as byproducts?

الكاتب أفضل إجابة

Ray,

It doesn't work because of user error...me. I revisited once I saw your note. Built a "phantom" product and loaded the three widgets as by products.

Alas it did work. This helps my process tremendously. Thanks for the nudge in the right direction.

الصورة الرمزية
إهمال
المنشورات ذات الصلة الردود أدوات العرض النشاط
6
أكتوبر 18
5820
2
ديسمبر 24
8339
0
مارس 23
1712
1
مايو 22
5288
2
نوفمبر 19
4935