تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
3219 أدوات العرض

It should be a rather common requirement for companies with logistics operation to consider warehouse or company calendar to propose a planned shipment date, but I cannot find any function to achieve this.  For example, many factories do not operate on Sundays, and we want the system to consider this non-working days in lead time calculation as well as to avoid the planned shipment date falling on that date. 

Is there an module to achieve this or anything similar?

الصورة الرمزية
إهمال
المنشورات ذات الصلة الردود أدوات العرض النشاط
1
فبراير 23
7864
0
مارس 15
8362
1
مارس 15
7974
1
مارس 15
7610
1
مارس 15
10615