تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
3585 أدوات العرض

Hello
I have a problem with generating transfers triggered via provisioning rules and routes in odoo 14. The example is:
I have "product A" that has a minimum supply rule of 10 units and a maximum of 20 units in "warehouse X". Warehouse Y has 100 units of "Product A". The supply route indicates that "warehouse X" is supplied from "warehouse Y" (the "buy" route is not selected).
This selection creates a new route called "warehouse X: Supply product from warehouse Y" with the rules:
1. Pull From almY / Stock Physical Locations / Inter-warehouse transit
2. Pull From Physical Locations / Inter-warehouse transit almX / Stock

When executing the scheduler, 2 transfers are generated, as indicated by the rules of the route. But in the case that another execution of the scheduler is generated for the replenishment of another product (product B) with the same route. The need for "product B" is added to the transfers already created. This generates a problem when preparing the products to be sent, since an already prepared transfer is altered ("prepared" status). My question is whether there is the possibility of generating separate transfers in this type of operations, where the demand for a transfer in the "ready" state is not altered by the execution of the scheduler and separate transfers are generated.
Emphasize that the generation of separate transfers must be despite the other transfers generated previously being in the "ready" state.

Thanks for the help

الصورة الرمزية
إهمال

have you solve it?

المنشورات ذات الصلة الردود أدوات العرض النشاط
1
يناير 21
2176
0
يونيو 23
1917
1
يناير 21
2079
2
مارس 15
5493
1
أغسطس 24
3822