We would like that certain product goes to another location than WH/STock after been manufacture. We use 3 step manufacturing, so last Internal Transfer (WH/Post-Production -> WH/Stock) should be different. I have tried to make indentical Manufacture Route except last rule, but not succeeded it.

If I check Routes diagram (Inventory, Products and there Inventoty tab and View Diagram in Rules section) my route look complete different than orginal Manufacture -route. And why orginal Manufacturing route doesn't show Manufacturing legend in diagram?

So what is easy way accomplish this?

形象
丢弃
编写者

When I change destination and try to replenish product, I get following user error
"No rule has been found to replenish "manufactured product" in "WH/Stock".
Verify the routes configuration on the product."

编写者

Here is route diagram. From orginal Manufacturing Route missing Manufature legend and my copy is different
https://i.imgur.com/e0Ov7Kd.png

最佳答案

Hello,

you can try this way:

1. duplicate this route 

"Pick components, manufacture and then store products (3 steps)"

and name it for example: "X route 2" 

2. open duplicate route from previous step and go to rules


3. choose third rule , open it then change the destination location like this:

Note: I hve created a new internal location and named it "new destination location"


4. save it , and go to your product categories menu item in Settings tab which will be your "certain product category 2", and choose the created "X route" under Routes


Note that: this route will be applied to products under this category when you create MO order, which means other manufactured products which belong to other category will follow the default route "standard 3 steps route"

5. create your cerain product under this category.


6. create MO order like this:


7. by going into smart buttons "transfers".


Note: the second transfer is from "post production" to "new destination location"

8. if we try to create Mo order for another product which belongs to another category:



9. by going to transfers


Note: the second transfer is from "post production" to "stock"


hope this will help.

形象
丢弃
编写者

Thanks very much of this clear step-by-step instructions.
One question, is is possible to automatic via reorder rules (replenish?) to start this MO?

Hi,
definitely! you can achive that by setting reorder rules to apply Manufaturing route when the finished product is needed in some place.

编写者

Where I can do that? I checked product reordering rules, but there is no possible to define Manufacturing route?

编写者

I found Preferred Route from reordering rules, but even I set it, it doesn't work what I have tested?

最佳答案

If 'another Location' is a child location of WH/Stock, maybe you can manually select "another location' as the destination location while validating the Internal transfer (WH/Post-Production -> WH/Stock) or even create a 'put away' rule

However if your manufacturing routes vary by product, you would require to provide the route in 'Operation' field in the Miscellaneous tab of the product BOM.

Please refer the below post
https://www.odoo.com/forum/help-1/can-i-manage-both-2-step-manufacture-store-and-3-step-pick-manufacture-store-manufacturing-in-odoo-204399

形象
丢弃
相关帖文 回复 查看 活动
3
12月 21
6789
2
5月 25
853
0
12月 24
3400
Workcenters 已解决
1
3月 24
1585
2
7月 23
7303