跳至内容
菜单
此问题已终结
1 回复
6062 查看

Dear All,

I have a product with many subassemblies (multi-level BOMs); meaning Product A consistes of B, B consistes of C, C consistes of D and so on; The creation of all MOs works, but I would like to consider available stock at any location before a MO is created. Means, when I already have 100 of B, I won't need the MO for Product B and below, but the MO for Product A just takes the stock of Product B.

Any idea how I can set up the routing that available stock is considered?

Thanks in advance!

Philipp

形象
丢弃

Philipp,

Did you ever figure this problem out?  We are on Odoo 13 and headed towards Odoo 16 but it doesn't appear that Odoo 16 can handle multi-level BOMs with values/attributes in the 2nd level.

最佳答案

You can consider your product as a Make to Stock so it will always check stock first. And if stock haven't enough stock it creates related MO or PO, ...
Documentation : Documentation 

形象
丢弃
相关帖文 回复 查看 活动
2
6月 25
1117
0
7月 24
5529
0
2月 24
524
2
8月 16
4361
1
7月 16
3717