跳至内容
菜单
此问题已终结
2 回复
11266 查看

How to calculate Half day leave in Open ERP.I have specified the date as 02/02/2014 9.00 to 13.00 in Duration field,the no of days as 0.5.But it is calculated as full day leave only.How to fix it?

形象
丢弃
最佳答案

The below patch Fixed the Issues to show the days calculated in 0.5 based on From and To date.

Example: 02/02/2014 9.00 to 13.00 in Duration field,the no of days as 0.5

https://gist.github.com/tejastank/5089560#file-hr_holidays_leave_correction-patch

形象
丢弃
相关帖文 回复 查看 活动
0
5月 21
2250
1
8月 17
3670