İçereği Atla
Menü
Bu soru işaretlendi

Hi everyone

In odoo we are able to create Purchase order from Manufacturing order .

But when RFQ created from above steps is confirmed and goods are received i am not able to see the received goods go through Quality control step.

On the other hand if i create PO directly from purchase the received goods go through the quality control step.


When PO created from MO-

Partner Location/Vendors -->WH/Stock

When PO is directly created-

Partner Location/Vendors --> Wh/Input-->WH/QualityControl-->WH/Stock


Can anyone tell me why this is happening or i have missed some configuration.

Avatar
Vazgeç

Let me know your customisation. Normally never happen such things. Probably you edited default routes....

İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Ara 19
2743
1
Haz 17
4477
1
Şub 25
1030
1
Mar 18
3287
2
Haz 25
1009