İçereği Atla
Menü
Bu soru işaretlendi
1 Cevapla
1611 Görünümler

Hi,

Before download the QC app and creat Bill Of Material and put "take a picture" as a quality control when open Taplet View All orders had "take a picture" in to do list, But After downloaded QC App "take a picture" did not appear in Taplet View to do list, Because of that My team can not "Close Production" in Manufacturing Oder.

How to delete QC App or make "take a picture" appear in all Taplet View to do lists?


Thanks in advance

Aunchalee


Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Tem 25
440
1
May 25
1021
2
Kas 24
2728
1
Tem 24
1552
0
Eki 23
1265