Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie
1 Odpowiedz
10582 Widoki

What is an order point and how and where is it used?

There is an "order point" option when the menu appears to run the scheduler. What happens if you enable or disable this option?

Awatar
Odrzuć
Najlepsza odpowiedź

that option is used when you want to create procurement orders for all the products that have virtual stock = 0.

otherwise the scheduler procures only the quantity of products needed to satisfy confirmed sales orders (or manually created manufacturing orders for instance).

Awatar
Odrzuć
Autor

I went to runbot where there's the demo data. I created a new product. It's inventory is zero. It is "make to stock" and to "buy". I ran the scheduler. There was no draft purchase quote generated. What am I missing in this process?

have a look at the procurement exceptions (Warehouse > Schedulers > Procurement exceptions). OpenERP tells you what's wrong with the procurements (e.g: missing supplier on the product form)

Autor

It would make sense that the scheduler would balk if there was no supplier in the product. But, there was no such exception generated. In fact no exceptions generated by me in these trials.

if that's true, it could be a bug. but you can also try to run the scheduler more than once, because it has to run N times according to the number of bom levels of the procured products for instance.

Powiązane posty Odpowiedzi Widoki Czynność
1
gru 24
8472
1
mar 15
4761
1
mar 15
10662
4
maj 24
17986
2
kwi 23
15278