Let's consider the following simple case:
1) I sell a product with a 10 days customer lead time
2) The vendor lead time for this product is 5 days
3) There is a Reordering Rule (min Q=0, max Q=0) on the product
Question: would the RFQ be created for the product as soon as possible or as late as possible? How did it change from v13 to v14.