تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
3449 أدوات العرض

Hello in one of my clients place average cost is going wrong, can anybody tell what will be the reasons for going wrong, they have sub assembly bom structure, we have installed landing cost module , and the thing is 1st transactions will be coming correct and other transactions its going wrong

الصورة الرمزية
إهمال

if bom structure contains a product that has to be manufactured and its average cost is 0, the average cost computed for the manufactured product would be wrong.

المنشورات ذات الصلة الردود أدوات العرض النشاط
0
مارس 19
3334
2
نوفمبر 22
4819
15
مايو 20
16848