跳至内容
菜单
此问题已终结
2030 查看

I've activated MPS (Manufacturing \ Configuration \ Settings \ Master Product Schedule). The issues are:

1) The MPS settings are exactly the same for all users and the companies

2) The settings cannot be changed after one set them up, even user has the superuser access (not possible to change neither Time range nor Number of Columns). 

形象
丢弃
相关帖文 回复 查看 活动
2
10月 21
4378
0
12月 20
3138
2
3月 17
4710
4
2月 24
10294
2
10月 16
5178