跳至内容
菜单
此问题已终结
5 回复
7771 查看

How are non billable hours generated

形象
丢弃
最佳答案

Project which has tasks and the tasks get updated in the timesheet. However, doesn’t create any sales order.

形象
丢弃
最佳答案

In Odoo 16, when Sales Order Item is set to blank, non-billable hours is reflected in Timesheet.

形象
丢弃
最佳答案

1) the project must be set as "billable"
and 2) it doesn't matter if a task is chosen in the timesheet entry or not but the task must not "private" (usually you can't connect a private task to a project and can't book times without project, so basically it doesn't matter):


timesheet overview:
The 5 hours here from Anita Oliver, where no Task was chosen, are nevertheless set as "billable hours" in the project, but not the times in the private task: 


attention with subtasks; It seems to not work properly here with billable or not:



形象
丢弃
最佳答案

if not linked to task ,

link directly to project

形象
丢弃

in V15 it doesn't matter (anymore?) if the timesheet is linked to a task or not. More important that the project = billable and the task is not "private"

最佳答案
Non billable hours are generated when timesheets are saved to manually created tasks in the Project module.



形象
丢弃