Skip to Content
Meniu
Trebuie să fiți înregistrat pentru a interacționa cu comunitatea.
Această întrebare a fost marcată
1 Răspunde
3819 Vizualizări

Hello,

We are using the manufacturing app to build PCs.

Our work flow is to pick the components needed based on the BoM, register the serial or lot number and then assembly them together.

Those operations are done at the same work center.

The problem is, if we configure the operations in that order : components registration and then assembly, Odoo only allows us to register consumption during the last operation.

Which is awkward for the operator since it does not reflect what he does in real life.

Do you have any idea on how we could optimise this flow ?

We tried to use steps in the operations, work with different work centers but it did not help either.


Thank you.


Julien

Imagine profil
Abandonează
Cel mai bun răspuns

In the BOM you can assign components to what operation you want them to be consumed.

You can also have several operations with the same work center.  Each operation will have a separate work order.  I am not sure if you will find the way to work optimised, but might get you on the way,

Imagine profil
Abandonează
Autor

Thank you Lars, assigning components to the operation worked !

Related Posts Răspunsuri Vizualizări Activitate
1
mai 22
2442
1
aug. 24
1626
4
mai 24
3552
1
mai 23
2438
0
apr. 23
1889