Hi,
I have a Bill of Materials (BoM) for a table where two components share the same raw material. The manufacturing process involves three operations — after the first operation, the tabletop is completed; the second operation finishes the table legs; and the final operation assembles both semi-finished components into the complete product.
In this scenario, if a defect is found in the table leg during the second operation and the wood panel component needs replacement or reissue, how can this be recorded and managed within the system?
