Skip to Content
Menu
Dette spørgsmål er blevet anmeldt
2 Besvarelser
6020 Visninger

We have two warehouses. Some products have stock in warehouse A, others in warehouse B. Now when we create a manufacturing order for a main product which BoM includes products from both warehouses, the system should consume the quantities from both warehouses. We have tried to build this process with different routes and pull rules but it wouldn't work as expected. I am sure it would be possible to configure but I can't make it work. So I am very grateful for any hints. 

Avatar
Kassér
Bedste svar

My suggestions:

1. Manufacturing warehouse = A
2. Resupply warehouse = B (check this in A and select B as Default Resupply Warehouse)
3. Use trick pseudo MTO in Reordering Rule.


Avatar
Kassér
Forfatter Bedste svar

Thank you for your tip. I knew the pseudo MTO but it was not the thing I have needed here. The problem was that we didn't select the MTO Route. Now with MTO active and some changes on the Route (we do not need two steps for adding products from other warehouse) it works like a charm. 

Avatar
Kassér
Related Posts Besvarelser Visninger Aktivitet
0
nov. 17
3423
0
mar. 15
3880
2
dec. 23
4296
0
dec. 22
1974
1
jul. 19
17794