İçereği Atla
Menü
Bu soru işaretlendi
4 Cevaplar
3191 Görünümler

I have tried several ways of exporting & importing (inc. the external id) to update the component level in the bill of materials but always get duplicate lines of components. I cannot figure out how I can do this & end up with the original component line but with an amended quantity. Anyone?

Avatar
Vazgeç
En İyi Yanıt

Please select BOM Lines/External ID


Avatar
Vazgeç
En İyi Yanıt

Hi,
you must export not only the BOM external id but also components lines external ids. did you do it and still get the same described result ?


Avatar
Vazgeç
En İyi Yanıt

Hello,

You also need to export the BoM Line external id. If you forgot to export line external id then it duplicate the lines. 

You have to export two external id.

 1) BoM external id 

2) BoM Lines external id

Avatar
Vazgeç
Üretici En İyi Yanıt

Thanks everyone. I have now managed to get the correct results thanks to your responses :)

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
3
Şub 25
931
0
Oca 25
1028
1
Haz 25
4751
0
Şub 19
3941
0
Kas 18
3320