İçereği Atla
Odoo Menü
  • Portal
  • Ücretsiz deneyin
  • Uygulamalar
    Finans
    • Muhasebe
    • Faturalama
    • Masraf Yönetimi
    • Elektronik Çizelge (BI)
    • Belgeler
    • İmza
    Satış
    • Müşteri İlişkileri Yönetimi (CRM)
    • Satış
    • Satış Noktası Mağaza
    • Satış Noktası Restoran
    • Abonelikler
    • Kiralama
    Web Sitesi
    • Web Sitesi Oluşturucu
    • eTicaret
    • Blog
    • Forum
    • Canlı Sohbet
    • eÖğrenme
    Tedarik Zinciri
    • Envanter
    • Üretim
    • Ürün Yaşam Döngüsü Yönetimi
    • Satın Alma
    • Bakım
    • Kalite
    İnsan Kaynakları
    • Çalışanlar
    • İşe Alım
    • İzin
    • Değerlendirme
    • Referans
    • Filo Yönetimi
    Pazarlama
    • Sosyal Medyada Pazarlama
    • E-posta ile Pazarlama
    • SMS ile Pazarlama
    • Etkinlikler
    • Pazarlama Otomasyonu
    • Anket
    Hizmetler
    • Proje Yönetimi
    • Çalışma Çizelgeleri
    • Saha Hizmeti
    • Yardım Masası
    • Planlama
    • Randevular
    Verimlilik
    • Sohbet
    • Onay
    • Nesnelerin İnterneti
    • VoIP
    • Bilgi Bankası
    • WhatsApp
    Üçüncü taraf uygulamalar Odoo Stüdyo Odoo Bulut Platformu
  • Sektörler
    Perakende satış
    • Kitapçı
    • Giyim Mağazası
    • Mobilya Mağazası
    • Gıda Marketi
    • Hırdavat Dükkanı
    • Oyuncak Dükkanı
    Gıda ve Konaklama
    • Bar ve Pub
    • Restoran
    • Fast Food Restoranı
    • Konuk Evi
    • İçecek Distribütörü
    • Otel
    Gayrimenkul
    • Emlak Acentesi
    • Mimarlık Firması
    • İnşaat
    • Emlak Yönetimi
    • Bahçe Tasarımı
    • Mülk Sahipleri Derneği
    Uzmanlık
    • Muhasebe Firması
    • Odoo Partner
    • Pazarlama Ajansı
    • Hukuk Firması
    • Yetenek Kazanımı
    • Denetim ve Belgelendirme
    Üretim
    • Tekstil
    • Metal
    • Mobilyalar
    • Gıda
    • Bira fabrikası
    • Kurumsal Hediye
    Sağlık ve Spor
    • Spor Kulübü
    • Optik Mağazası
    • Fitness Merkezi
    • Sağlıklı Yaşam Merkezi
    • Eczane
    • Kuaför Salonu
    Ticaret
    • Tamirci
    • BT Donanım & Destek
    • Güneş Enerjisi Sistemleri
    • Ayakkabı İmalatçısı
    • Temizlik Hizmetleri
    • HVAC Hizmetleri
    Diğerleri
    • Kar Amacı Gütmeyen Kuruluş
    • Çevre Ajansı
    • Reklam Panosu Kiralama
    • Fotoğrafçılık
    • Bisiklet Kiralama
    • Yazılım Bayisi
    Tüm Sektörlere Göz Atın
  • Topluluk
    Öğrenim
    • Eğitim Araçları
    • Dokümantasyon
    • Sertifikasyonlar
    • Eğitim Etkinlikleri
    • Blog
    • Podcast
    Eğitim ve Gelişim
    • Eğitim Programı
    • Scale Up! İşletme Oyunu
    • Odoo'yu Ziyaret Edin
    Yazılım
    • İndirin
    • Sürümleri Kıyaslayın
    • Sürümler
    İş Birliği
    • Github
    • Forum
    • Etkinlikler
    • Çeviriler
    • Partner Olun
    • Partnerler için Hizmetler
    • Muhasebe Firmanızı Kaydettirin
    Hizmetler
    • Partner Bulun
    • Muhasebeci Bulun
    • Bir danışmanla görüşün
    • Kurulum Hizmetleri
    • Müşteri Referansları
    • Destek
    • Sürüm Yükseltme
    Github Youtube Twitter Linkedin Instagram Facebook Spotify
    +1 (650) 691-3277
    Demo randevusu alın
  • Fiyatlandırma
  • Yardım

Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:

  • Müşteri İlişkileri Yönetimi
  • e-Commerce
  • Muhasebe
  • Envanter
  • PoS
  • Proje Yönetimi
  • MRP
All apps
You need to be registered to interact with the community.
All Posts People Badges
Etiketler (View all)
odoo accounting v14 pos v15
About this forum
You need to be registered to interact with the community.
All Posts People Badges
Etiketler (View all)
odoo accounting v14 pos v15
About this forum
Yardım

How to avoid users to mark a task as done when it is blocked by another task

Abone Ol

Get notified when there's activity on this post

Bu soru işaretlendi
projecttasksblocked
1 Cevapla
1454 Görünümler
Avatar
Peter Romão

As said in the title.

I just defined a task to be blocked by another and I was expecting to not being able to mark it as done until the blocking task has been completed.

Well, it appears that it can.

Does this make any sense? The Help AI's response to this is kind of unacceptable.

It says:

There are a few reasons why a blocked task in Odoo might be marked as done even if the tasks blocking it are not yet finished:
  • Kanban Stage Independence: Odoo's task statuses ("Done," "Canceled," etc.) are separate from the Kanban stage a task is in. You can mark a task as "Done" regardless of its current stage.
  • Reopening Tasks: A task can be reopened by changing its status, even after it's been marked as "Done" or "Canceled".
  • Manual Override: Users might have the ability to manually override dependencies or task statuses, depending on their permissions and how the project is configured. This could be done intentionally (e.g., if the blocking task is no longer relevant) or unintentionally.
However, it's important to consider the following:
  • Task Dependencies: Odoo Project allows you to establish relationships between tasks to determine the order in which they are executed. Task dependencies ensure that certain tasks begin only after the preceding tasks are completed.
  • Work Order Dependencies: Odoo Manufacturing features a work order dependencies setting. Enabling this setting allows for operations on a Bill of Materials (BoM) to be blocked by other operations that should occur first.
  • Waiting Status: Successor tasks are assigned the Waiting status and cannot be moved to In Progress until their predecessor task(s) are marked as Approved, Cancelled, or Done.

So as will all AI's we must accept inaccuracies and think instead of just following blindly.

So this begs the question how can we limit a user+s capability to mark a blocked task as done while the tasks it depends on are not finished?project


0
Avatar
Vazgeç
Peter Romão
Üretici

Thank you for the time taken to answer and I agree with the flexibility. It is what makes me like the project tool in Odoo. Your closing argument is the clincher!

I just put another post around this issue which has to do with the notification in a collaborative environment.

I’d appreciate it if you or anyone could give their two cents.

https://www.odoo.com/forum/help-1/how-does-a-blocked-task-owner-receives-notification-or-e-mail-that-the-blocking-task-is-finished-274514

Cheers

Avatar
Ray Carnes (ray)
En İyi Yanıt

We always defer to the User to decide if they are "blocked" and unable to proceed. Does it mean they can't start or does it mean they can't finish?  Perhaps it is the first, perhaps the second, perhaps BOTH!

This is a more flexible design than assuming we always have to stop them from doing what they probably already know how to manage better, since things evolve over time and it is impossible to program an algorithm with every current and future edge case handled in a better way than the people who do the work.

Blocking when unnecessary can be very frustrating for everyone involved - delays are costly and bottlenecks can arise if the "manager" who can unblock Users is unavailable or can't process sufficient Tasks in a timely manner.

Consider some of the alternative definitions of blocked that may apply: 

Partial dependency – The first task is not entirely dependent on the second task but work on the second task needs to reach some level of completion first.

Potential Resource Block – The first task is waiting on a shared resource (e.g., a machine, person, or approval) that is currently being used in the second task, but a smart User may find an alternative (or arrange to share).

Partial Process Block – The first task needs to be delayed due to an internal process, such as waiting for documentation or feedback based on the second task, but other work related to the first task can be started (or finished) and perhaps only part of the second task needs to be completed before the first one can be finished.

Potential Workflow Hold – The first task is on hold due to company policies or external constraints related to the second task, not the second task's completion, and there could easily be exceptions so the block is more of a "heads up".

Verification Block – The first task is awaiting validation, quality checks, or reviews defined on the second task before proceeding, some of which may not prevent work from starting of being finished.

Users are smart enough to know what blocked means, we don't recommend second guessing them.

0
Avatar
Vazgeç
Enjoying the discussion? Don't just read, join in!

Create an account today to enjoy exclusive features and engage with our awesome community!

Üye Ol
İlgili Gönderiler Cevaplar Görünümler Aktivite
Overview of all notes
project tasks
Avatar
0
Şub 24
2516
Unable to assign tasks to employees Çözüldü
project tasks
Avatar
Avatar
2
Eki 23
2692
Project and Tasks Çözüldü
project tasks
Avatar
Avatar
1
Tem 23
2839
Move tasks between projects
project tasks
Avatar
Avatar
Avatar
2
Haz 20
6407
Assign Specific Group of Members to Project/Tasks
project tasks
Avatar
0
Ağu 15
4993
Topluluk
  • Eğitim Araçları
  • Dokümantasyon
  • Forum
Açık Kaynak
  • İndirin
  • Github
  • Runbot
  • Çeviriler
Hizmetler
  • Odoo.sh Hosting
  • Destek
  • Sürüm Yükseltme
  • Özel Geliştirmeler
  • Eğitim
  • Muhasebeci Bulun
  • Partner Bulun
  • Partner Olun
Hakkında
  • Şirketimiz
  • Pazarlama Gereçleri
  • İletişim
  • Kariyer
  • Etkinlikler
  • Podcast
  • Blog
  • Müşteriler
  • Hukuki • Gizlilik
  • Güvenlik
الْعَرَبيّة Català 简体中文 繁體中文 (台灣) Čeština Dansk Nederlands English Suomi Français Deutsch हिंदी Bahasa Indonesia Italiano 日本語 한국어 (KR) Lietuvių kalba Język polski Português (BR) română русский язык Slovenský jazyk slovenščina Español (América Latina) Español ภาษาไทย Türkçe українська Tiếng Việt

Odoo, müşteri ilişkileri yönetimi, eTicaret, muhasebe, envanter, satış noktası, proje yönetimi gibi şirketinizin tüm ihtiyaçlarını karşılayan bir açık kaynak işletme uygulamaları paketidir.

Odoo’nun eşsiz değer önermesi, aynı anda hem kullanımının çok kolay olup hem de tamamen entegre olmasıdır.

Website made with

Odoo Experience on YouTube

1. Use the live chat to ask your questions.
2. The operator answers within a few minutes.

Live support on Youtube
Watch now