MRP: Advanced traceability and costing

MRP

Public Channel / Odoo Experience 2016

By Michaël Vercruyssen - Business Analyst

Share on Social Networks

Share Link

Use permanent link to share in social media

Share with a friend

Please login to send this presentation by email!

Embed in your website

Select page to start with

4. Activate the traceability

3. Optimise the Traceability: Install the new V10 Odoo enterprise with Purchase, Sales, inventory & manufacturing apps

9. Thank you. #odooexperience EXPERIENCE 2016

1. MRP: Advanced traceability and costing Michael Vercruyssen • Functional consultant EXPERIENCE 2016

8. For more information : Tomorrow at 12:30 in the main theater Advanced MRP KPIs and how they are computed (OEE, MTBR, MTTF)

2. Introduction 1 1/ Buy and sell unique serial number 2/ Manufacture lots 3/ Cost Analysis Conclusion 2 3 4 5

5. Serial number Buy 3 products and sell 2 of them Upstream: from customer to Supplier (e.g. if a customer ask you the origin of its product parts). - Create a new product (Sale Price, Cost, Tracking by unique serial number, 2 vendor cost) - Create 2 PO - Receive 3 time this product - Sell this product in 2 SO (1 & 2) and deliver it - Show the origin of the 2 serial number of the second sale

6. Lots Buy 3 lots of components to manufacture and sell 6 products 1) Create a product tracked by serial number (MTO, Manufactured) 2) Do a BOM with 2 components 3) Make one of these component tracked by lots (Brake: add Unit Cost) 4) Buy 3 lots of 2 components 5) Sell and Manufacture 6 products then deliver everything 6) One of the lots has an issue, so call back the 2 impacted final product using the traceability report on the impacted lot Downstream Traceability: From Supplier to Customer (e.g. to find car to call back if wrong pieces from a Supplier)

7. Cost Analysis 1) Manufacturing Settings: “Manage production by work orders” 2) Create 2 new work centers with “Cost per hours” and create a routing with them 3) Create a new product & a BOM with 1 stockable and 2 consumable 4) Set the routing on this nes BOM and show the “BOM Cost” a) It is a static report b) Soon the “Cost per hours” from the work Centers will be integrated 5) Create a new MO > Plan > process the 3 WO 6) Mark the MO as Done 7) Analyse the REAL COST for this MO 8) Do a second MO 9) Analyse the REAL COST for a product (Total & Unit Cost) => select manually the MO to analyse via the final product

Views

  • 14 Total Views
  • 0 Website Views
  • 14 Embeded Views

Actions

  • 0 Social Shares
  • 0 Likes
  • 0 Dislikes
  • 0 Comments

Share count

  • 0 Facebook
  • 0 Twitter
  • 0 LinkedIn
  • 0 Google+

Embeds 2

  • 70 internal.odoo.zone
  • 2 onlinesync.odoo.com