A 360° Overview of the New Odoo MRP

MRP

Public Channel / Odoo Experience 2016

By Nicolas Pénicaut - Business Advisor, Odoo

Share on Social Networks

Share Link

Use permanent link to share in social media

Share with a friend

Please login to send this presentation by email!

Embed in your website

Select page to start with

21.

5. Next Generation MRP Software

7. Keep IT Simple

9. Create MOs directly from the MPS

14. Maintenance Requests

16. Efficient BoM and routing version m a n a g e m e n t

18. Next Generation MRP Software

22. Used and Loved By

23. Thank you for your attention

1. MRP, PLM, Quality & Maintenance Together at last!

11. Workcenter Control P a n e l Track Time Display Worksheets Register Production Integrate Quality checks In Process Alerts Record Serial/lot number

13. ! A worker triggers a quality alert

2. The average manufacturer might use as many as 10 different ap p l i c a t i o n s to run their business.

6. Manufacturing (MPS, Time clocking, MO) 1 Maintenance (request, MTBF) PLM (ECO, approvals) Quality (checks, controls) Reports 2 3 4 5

4. Planning & S c he d ulin g Pro c uremen t Logistics Asset M an age me n t IT Industrial E n g ineerin g Q u alit y Production C o n t r ollin g Maintenance M an age me n t Integrating different platforms is expensive, time consuming, and inefficient.

17. Checks at: • Intake • In - process • Post - process Communicate efficiently • Send Alerts toWorkers • A t I n v ento r y & m a n ufac t urin g l e v e l Quality Control Plan

15. Engineering Change Orders Approvals: (manufacturing orders) Cu s t o m iza b l e workflow Deploy easily • By role • Comment or blocking • N PI • Worksheet updates • Versioning • Trigger alerts for the manufacturing (next MO)

12. Record work operations on tablets: • Record productions • Display worksheets • Time tracking • Quality control • Barcode support • Trigger issues Manufacturing

8. Automate scheduling: • Master Production Schedule (MPS) • Minimum Stock Rules • Make - to - Order Manage planning: • Gantt Chart • Capacity planning and a d j u s t m e nts P la n

10. Set time manually: (industry standard) • Requires time clocking every operation • Static, does not evolve with the process Operation Durations Compute real times: (Odoo innovation) • No time clocking needed, evolve with the process • Based on average & standard deviation

3. A typical IT stack. M R P Q u a li t y A cc o un t in g M a i n t e n a n c e PL M eP r o c ur e m e n t After Sales Inventory

19. MRP • Costing • Traceability • Time Tracking • Inventory Forecast Maintenance • Overall Equipment Efficiency • Mean Time Before Failure • Mean Time to Repair Quality • Statistical Process Control • Root Cause Analysis • APQP • PMEA PLM • ECO Statistics • Versions Control (e/m - BoM) And great reports...

20. Overall Equipment Effectiveness R e c o mm e nd e d Six Big Losses Unplanned Stops Availability Loss Planned Stops S ma l l Stops Performance Loss Slow Cycles Production Rejects Quality Loss Startup Rejects OEE Fully Productive Time O E E Recorded from operations on the work center Tab let

Views

  • 10 Total Views
  • 0 Website Views
  • 10 Embeded Views

Actions

  • 0 Social Shares
  • 0 Likes
  • 0 Dislikes
  • 0 Comments

Share count

  • 0 Facebook
  • 0 Twitter
  • 0 LinkedIn
  • 0 Google+

Embeds 1

  • 67 internal.odoo.zone