Re: Re: Re: Re[2]: Complete A­sset­ man­agement module

by
Vasiliy Birukov
- 09/22/2014 09:16:26

You can maintain PMs with frequency in time, if you define meter in time unit of measure as you like.
You can use any number assets. For each asset you have to define PM rule. And each asset will be planed according to their rule.

Пнд 22 Сен 2014 15:16:10 +0400, Eaksha Holdings Limited (Pvt) <infor@eaksha.com> написал:

Can we maintain PMs with frequency in time (days, weeks, years) rather than meter intervals?

Can we keep many equipments under one PM and get system generated work orders according to the frequency.

Thank you
Asanga
Eaksha Holdings

On 22 Sep 2014 14:00, <wowas18@nm.ru> wrote:

In MRO PM you operate with ASSET, so it can be as equipment, as instruments, as vehicles or anything as you like :)

Пнд 22 Сен 2014 11:07:53 +0400, Eaksha Holdings Limited (Pvt) <infor@eaksha.com> написал:

MRO PM also doesnot have what I need. We should consider all the machinery equipment and instruments also for maintenance and calibration and not only vehicles.

Do you have any module which can do these options.

Thank you
Asanga

You need module MRO PM

Вск 21 Сен 2014 22:44:14 +0400, Eaksha Holdings Limited (Pvt) <infor@eaksha.com> написал:
 
MRO does not have PM schedules and work orders and cannot run or schedule PMs and a get a list of work orders o a given date. Also calibration is not existing. How to get them?
 
 
 
------ Original Message ------
From: "Caudal Eric" <caudaleric@gmail.com>
To: "Community" <community@mail.odoo.com>
Sent: 9/21/2014 3:09:45 PM
Subject: Re: Complete Asset management module
 
<BLOCKQUOTE XSSCleaned=cite2 cite=CABxYQ6V=kGZ6R6gEu3BBPkAN+wRMfhPnj-drPj+1LdwswR-LCg@mail.gmail.com type="cite">

MRO modules are complete and should do the trick.

On Sep 21, 2014 4:49 PM, "Eaksha Holdings (Pvt) Limited" <infor@eaksha.com> wrote:
Dear All,
 
Can somebody tell me the list of modules I should install to get the following in preventive maintenance
 
1. Add all the master data of my machines used in the production and their spares with the hierarchy of equipment.
2. Add all the preventive maintenance schedules for all the machines with frequencies in time.
3. System should notify me once the time of PMs completed and I should plan maintenance according to it and create jobcards and need to run a scheduler of PM of equipments.
4. I should need to enter spare parts, labour cost in labour hours, additional costs into all the work orders and total cost of maintenance should roll out to the machine.
5. Enter break downs of the machines
6. Conduct calibrations of instruments for inhouse and out source calibration.
 
Thank you
Eaksha Holdings (Private) Limited
 
 
 

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe