Re: Re[2]: Complete Asset management module

by
Pedro M. Baeza
- 09/22/2014 03:27:09
Hi, Eric, I have the same troubles: I can't use my job email account (also host in 1and1 by the way), and now I'm receiving double each post, because I'm not able to unsubscribe any of both accounts.

Regards.

2014-09-22 5:23 GMT+02:00 Caudal Eric <caudaleric@gmail.com>:
True: it is not as "complete" as I stated but the framework is good enough to start: we created a connector between Coswin and OpenERP on CMMS.
There is no costing nor calibration as far as I remember
@Ana,
This one should do the trick: https://www.odoo.com/apps/7.0/mro/
(I ll have to check later)
There have been 2 different versions version different of the module but this one was pretty clean, using procurement and stock moves in the right way.
Eric
PS: BTW Am I the only one having trouble with the mailing list?
- I had to start a new mail account as all my mail sent by my email hoster (1and1, one of the biggest) are bounced back. OpenERP support is ignoring my request so far...
- impossible to unsuscribe from the main page
- I dont know have way to know which ML I am subscribed


2014-09-22 2:44 GMT+08:00 Eaksha Holdings (Pvt) Limited <infor@eaksha.com>:
 
MRO does not have PM schedules and work orders and cannot run or schedule PMs and a get a list of work orders o a given date. Also calibration is not existing. How to get them?
 
 
 
------ Original Message ------
From: "Caudal Eric" <caudaleric@gmail.com>
To: "Community" <community@mail.odoo.com>
Sent: 9/21/2014 3:09:45 PM
Subject: Re: Complete Asset management module
 
<BLOCKQUOTE class=cite2 cite=CABxYQ6V=kGZ6R6gEu3BBPkAN+wRMfhPnj-drPj+1LdwswR-LCg@mail.gmail.com type="cite">

MRO modules are complete and should do the trick.

On Sep 21, 2014 4:49 PM, "Eaksha Holdings (Pvt) Limited" <infor@eaksha.com> wrote:
Dear All,
 
Can somebody tell me the list of modules I should install to get the following in preventive maintenance
 
1. Add all the master data of my machines used in the production and their spares with the hierarchy of equipment.
2. Add all the preventive maintenance schedules for all the machines with frequencies in time.
3. System should notify me once the time of PMs completed and I should plan maintenance according to it and create jobcards and need to run a scheduler of PM of equipments.
4. I should need to enter spare parts, labour cost in labour hours, additional costs into all the work orders and total cost of maintenance should roll out to the machine.
5. Enter break downs of the machines
6. Conduct calibrations of instruments for inhouse and out source calibration.
 
Thank you
Eaksha Holdings (Private) Limited
 
 
 

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe




--
Eric CAUDAL
+86 186 21 36 16 70

_______________________________________________
Mailing-List: https://www.odoo.com/groups/community-59
Post to: mailto:community@mail.odoo.com
Unsubscribe: https://www.odoo.com/groups?unsubscribe