Hi,

I have thought that when manufacturing certan set of wires (connectors + wwires between them) connectors could be calculated by units and wires as meters. So, when manufacturing i piece of this cable set system could calculate that (for example) 1 meter of wire will be consumed and know that that cable reel has (for example) 24 meters of cable. So, after some time it could reduce the amount of cable reel by one (when 24 meters have been consumed).

How this could be set up by using these different amount and measure unit possibilities?