This is my case:
I have an employee who is costing me 12 ct/hour. He does all my manufacturing work. Every manufacturing product has a different production time and thus different production costs.
I can create a work center âhumanâ for 12 ct/hour. I can connect the work center to a routing and enter the production time. But now the problem. The production time is different on every product. I have 2000 manufacturing products. Do I need to make 2000 routings?
Is there an easier way?