I'm having some issues with the MRP in Odoo 9 I've created correctly the BoM for a product as well the work center and the routing.
Both the final product as the raw materials are tracked by Lots.
When I create a manufacturing order, it doesn't let me consume the raw materials (selecting the correct lots) if I don't click on Produce button.
it appears the error:
Because the product ********** requires it, you must assign a serial number to your raw material ########## to proceed further in your production. Please use the 'Produce' button to do so.
I'f I use the produce button, the manufacturing order goes to finished stage instantly.
Sure that something isn't correctly configured but what is it?