SITA Asia Pacific Limited

SITA Asia Pacific Limited

Implementado por

System In Motion HK Co., Limited (2 referencia(s))

System In Motion HK Co., Limited
Flat/RM B, 03/ F, Kai Wan House, 146 TUNG CHOI STREET
200042 Mongkok
Hong Kong
+8613764909291
stephane.monsallier@system-in-motion.com

The Organic Waste Treatment Facilities (OWTF) Phase I development (hereinafter referred to as “the Project’) is to design, construct and operate a biological treatment facility with a capacity of about 200 tonnes per day and convert source-separated organic waste from commercial and industrial sectors (mostly food waste) into compost and biogas through proven biological treatment technologies. The Project Site is located at Siu Ho Wan in North Lantau with an area of about 2 hectares. 
有机废物处理设施(OWTF)第一阶段开发(以下简称“项目”)是设计、构建和运行一个生物处理设施能力约200吨每天将source-separated有机废物从商业和工业部门(主要是食物浪费)成堆肥和沼气通过行之有效的生物处理技术。工程地点位于北大屿山的小蚝湾,面积约2公顷。