Time in stage analysis¶
단계별 소요 기간 분석 보고서에서 채용 프로세스의 각 단계에 지원자가 얼마나 오랫동안 머무르게 되는지 확인할 수 있습니다. 모든 직무에 있는 프로세스 세부 정보 에는 지원자가 단계 사이에서 대기해야 하는 기간이 명시되어 있기 때문에 이 내용은 중요합니다.
Knowing how long applicants remain in each stage can help highlight possible bottlenecks. Analyzing this data allows the recruitment team to assess each stage, identify any issues, and pivot their strategies to move applicants through each stage, within the expected time interval.
Time in stage analysis report¶
To access the report, navigate to (Line Chart).
. By default, the report displays data from all job positions, with the stages populating the x-axis, and the number of days populating the y-axis, in aThe default filter is Last 365 Days Applicant, showing information for the last 365 days.
Hover over a stage in the line chart to reveal a popover window listing all the job positions within it, and the average number of days each job position sits in each stage.
For a more visually digestible view of the information in the Time In Stage Analysis report, click the (Bar Chart) icon in the upper-left corner. This displays all the information in a bar chart.
In this view, it is easier to visualize the differences between the job positions, regarding how long applicants stay in each stage. From this view, recruiters can more easily determine which job positions have delays or bottlenecks at certain stages.
Use case: comparing times by month¶
With the Time In Stage Analysis report, it is possible to see if there are certain months where applicants take longer to be moved through the pipeline. To view this data, switch to the (Pivot) view in the upper-right corner.
This presents the data in a detailed pivot table, with the rows representing the different job positions, and the columns representing the stages. The average Days in Stage populates the various boxes.
참고
If a field is empty, it indicates no applicant has been in that stage. Instead, all applicants moved from a previous stage without being placed in the stage with an empty field.
Click Total above the job position rows to collapse the information. Next, click Total again, revealing a drop-down menu. Click Add Custom Group at the bottom of the list, revealing further grouping options. Click Start Date from the expanded list.
After doing so, the data presented is grouped with the various months from the previous 365 days for the rows, leaving the Days In Stage as the columns.
In this example, July 2024 had the longest time that applicants spent in each stage, on average. In addition, the Contract Proposal stage had the longest wait time in July, with an average of 31.62 days in that stage.
While this report does not display the reasons applicants stayed in the various stages for these lengths of time, it can be helpful to know when delays occur.